April 4th, 2020

Follow Us :-

Helpline :- 9808980807, 09811982710

ONGOING HIGHWAY PROJECTS

Ongoing Projects-

  • Topographical Surveys for Construction for Varanasi-Gorakhpur NH-29 km 88-km208 Conesesnior JP Assoociate Consultant AECOM 120km
  • Topographical Survey &Traffic Survey and ROW pillar fixing for Nagpur-Mumbai Super Communication Expressway Package-III for LBC 165km
  • Topographical Survey for NH927A Swaroopganj – Kherwara-Dungarpur-Banswara MP Border- AECOM , NHAI 200km
  • Topographical Survey for Preparation of DPR, BID Documents, Monitoring, Engineering for Output- and Performance based Road Contracts (OPRC) Road Works (GSHP-II)” in the State of Gujarat – Feedback 101km
  • Topographical Survey for NH 333A Shekhpura-Sikandra-Jamui-Jha-Jha Banka-Panjawara up to Jharkhand Border in the state of Bihar-Feedback 197 km

Completed Projects-

1. Topographical Survey of state highways in the state of Rajasthan PWD Pckage-I

  • Km 39 - km 267 of SH-3 comprising of section from Padampur to Bikaner (Highway-i)
  • Km 71 to Km 231 of SH-6 comprising of the section from Dungargarh to Rajgarh (Highway-II)
  • Km 9- km 43 of SH-7A comprising of the section from Hanumangarh to Abohar (up to panjab border)(Highway-III)
  • Km 0- km 85 of SH-7B comprising of section from Sadulsahahr to Srikaranpur (Highway-IV)

2.Topographical Survey of state highways in the state of Rajasthan PWD Pckage-II

  • Km 121 to k 187 of SH-22 comprising of section from Kherli to Pahari (upto Haryana Border)(Highway-I)
  • Km 0 to km 60 of SH-44 comprising of section from NatanikaWara to Kathumer (Highway-II)
  • Km 61 to km 98 of SH-44 comprising of section from Kherli to Nadbai-Kumber (up to UP Border) (Highway-II)
  • Km 99 to km 129 of SH-44 comprising of the section from Deeg to Kamam (upto UP Border) (Highway-IV)

Pre bid Levelling work for widening and strengthening of existing 2 lane carriageway to four lanes with paved shoulder of Harike-Zira-Faridhkote and Faridhkote to Kolkapura-Bhatinda section of NH-15 in the state of Punjab.

3. Topographical Survey for up gradation of state Highways in Uttar Pradesh through Engineering. Procurement and Construction (EPC)Basis. Package-10 Panipat-Khatima Road (UP Section)(SH-12) 147 km 4-lane.

4. Topographical Survey for Nepal Border (at Kakarvila) to Bangladesh Border (at Banglahandha) comprising of KakarbittaPanitanki-Bagdodara-Shivmandir more-Naukaghat-Fulbari-Banglabandha section 33 km of AH-02 Corridore in the stste of West Bangal.

5. Topographical survey for Pilibhit -Lakhimpur-Nanpara NH-730 229 km the state of Uttar Pradesh.

6. Topographical Survey for Detailed Feasibility Report for upgradation of Roads in the state of Uttar Pradesh for Sitapur-Lakhimpur-Palia-Dudhwa Road (SH-90,SH-21) Najafgarh Drain Kakrola Mode to Nehru Vihar in The State of Delhi for Feedback Infra.

7. Topographical survey for Dungergarh-Rajgarh SH-6 in the state of Rajasthan.

8. Topographical Survey for Metra city-Datiwara SH-21 87 km.

Siwana to Balesar SH-66 -90km, Dangiawas to Balotra SH-68-130 km in the state of Rajasthan for Feedback Infra.

9. Topographical survey for Jalalbad-Bewar (sh-29) 80 km and Utraula-Faizabad (sh-9)and Utrala to Balrampur (sh-26) in the state of UP.

10. Topographical Survey for Transit Cooridor Development at ISBT-Loni Road-Jagatpur-soniaVihar in state of Delhi.

11. Topographical survey for NH-2 Nizamundin circle -Ashram-Badarpur in the State of Delhi.

12. Topographical survey for Rishikesh- Rudraprayag (NH-58) 140km in the State of Uttrakhand.

13. Topographical Survey for Kerala PWD Road 248 km for Egis India.

14. Topographical Survey for Rehabilitation and Modernization of Irrigation infrastructure of Etawah Branch Canal &Bhognipuar Branch of Lower Ganga Canal System (L.G.C) in Uttar Pradesh 502 km. for REDDECON.

15. Topographical Survey for Katihar-Balrampur (SH-98) Package VII-68 km

We are working for the following Projects (Topographic Survey & Traffic Surveys, Related Services)

  • Topographical Survey For Delhi - Jaipur Expressway ( Green Field Project) km 20-40 and km 60-146km
  • Topographical Survey for Srinagar Bypass 60 km
  • Carring Out the DGPS ,Total station and leveling work along the proposed of WDFCC (Idbalgarh to Sabarmati -150 km)
  • Carring Out the DGPS ,Total station and leveling work along the proposed of WDFCC (ISabarmati T Vadodara=210km)
  • Topographical Survey for BRDCL Project Vaishali Corridor-78km
  • Topographical survey for Darbhangha_ North-South corridor-95 km
  • Topographical Survey Patna Road Elevated Project- Agra -Lucknow Expressway new alignment (GREEN FIELD PROJECT) 270 KM and its connected road Firozabad-Fatehabad and Umrada (Tirwa) - Kannauj Total Length=302km and Link Road 35 km
  • GRIDIH- GANDE at Jharkhand road Topographical survey
  • Traffic survey for four laning of Baharagora to Sambalpur section of NH-6 (KM 199.200 to 567.400)


16. Topographical & Traffic Survey-
a ) Traffic Survey at Panchkula - Yamuna Nagar Section 106 km (NH-73) State of Haryana
b ) Topographical Survey for Bikaner to Phalodi at NH-15 State in Rajasthan 165 km
c ) Topographical Surveyat Patiala- Bhatinda km 50 to km 209.500 of NH-64 State in Panjab 166 km
d ) Trafic Survey for NH-5 Bikaner to Phalodi , and Traffic survey NH-65 Salasar -Naguar Traffic Survey for NH-5 ( SectionBhubneshwer- Ichhapur)
e ) ADB TA 7650-REG Regionl Transport Development in South Asia for Traffic Survey at Bangladesh,Bhutan and Nepal Border for Egis International
f ) MP NVDA Dam and Canal project 4000-5000 hect. atKhargone , Dhar and Ali Rajpur District state of Madhya Pradesh.
Trans Highway at Arunachal Pradesh NH-229 Tenga to Seppa 80 km this Hilly terrain.
g ) NH -6 Center line and Joint Measurement with Taluka Land Record km 489 km .
MPRDC at Unhel -khachrod - Badnagar section 51 km
h ) Traffic Survey for NH-15 Suratgarh to ShriGanganagr
i ) NHAI Project NH- 6(KM 166 TO KM 649) ROW Pillar and Centre line Stakeout

17. BRTS Project Mukundpur-Kondli in Delhi Client Egis India (DIMTS)- a ) BRTS Project Hubli - Dharwad in Karnataka State client CEPT University Ahmadabad
b ) NH-28A PipraKoti - Raxual (Bihar) topographical survey and Stakeout of Centerline
c ) NRDA Raipur Town Planing topographical survey and Stakeout of Centerline
d ) Udaipur Bypass topographical survey and Stakeout of Centerline
e ) Indore Ring Road detailed topographical survey and Stakeout of Centerline
f ) NH6 (Km 530 to km 649 End of Gujrat Border) detailed topographical survey
vNRDA (Naya Raipur Development Authority) 3 Lake Bathometry survey and PHQ Site topographical survey Firozabad Bypass (km 232 to 252) (NH-2 )
g ) Jeolikot to Ghigharikhal (NH 87E KM 0-Km 109) &Bathinda Bypass - Punjab
h ) Sea link project Moramgao to Dona Poula (Goa )

18. Topographical survey for Barabanki-Lakhimpur under BRT in the state of Uttar Pradesh-AECOM.

19. Topographical &Traffic survey for Shahpur-Alwar NH248A in the state of Rajasthan.-AECOM.

20. Topographical survey for Construction for Bilaspur-Tekkadehrighat-Benari Village NH-200 for Civil baba in the State of Chhattisgarh.

21. Topographical survey for Constructon for Simira- Begusari-Khagaria NH-31 for CIVILBABA-Punjlloyd in the state of Bihar.

22. Topographical survey for Construction of Gorakhpur bypass, for Civilbaba-MCL.

23. Topographical survey for Construction project Haridwar-Nagina MH-74 for ISOLUX.

24. Topographical survey for Construction NH71 Moga-Tallewal&Tallewal-Baranala for AECOM – Patel &Civilbaba-VRC in the State of Punjab.

25. Topographical survey for Nagpur-Katol-Warud –SH 248A in the state of Maharashtra – SA Infra.

26. Topographical survey for Jaipur Ring Road Western side for S A Infra.

27. Topographical survey for Railway line Udaipur – HimmatnagarTendor No.-20 for MG Contractor.

28. Topographical survey for Ramban-Banihal NH-1A consesnior for HCC(36 KM).

29. Topographical survey for stretch of NH-930, Jhalmala-Balod-Kusumkasa-Kohka in the State of Chhatisgarh (85KM)-SA Infra.

30. Topographical survey for stretch of NH-351,Near Mahuva ,-Savarkundla-Amreli-Bagsara-Jetpur in the State of Gujarat (185km)-SA Infra.

31. Topographical survey for Bilaspur-Takhatpur-Mungeli-Pondi NH-130 (KM 105 Km)-SA Infra.

32. Topographical survey for Lucknow Ring Road in the state of Uttar Pradesh (105km)(Green Field alignment)-Jacob-CES.

33. Topographical survey for Zirakpur –Patiala NH-64 (25 KM) for consesnior-Transys.

34. Topographical survey for Agra Inner Ring Road Phase-2 for ADA AGRA Patiala Bypass 19 km for consesnior.

35. Topographical Survey of state highways in the state of Rajasthan PWD Pckage-I

  • Km 39 – km 267 of SH-3 comprising of section from Padampur to Bikaner(Highway-i).
  • Km 71 to Km 231 of SH-6 comprising of the section from Dungargarh to Rajgarh(Highway-II).
  • Km 9- km 43 of SH-7A comprising of the section from Hanumangarh to Abohar(up to panjab border)(Highway-III).
  • Km 0- km 85 of SH-7B comprising of section from Sadulsahahr to Srikaranpur(Highway-IV).
  • Pre bid Levelling work for widening and strengthening of existing 2 lane carriageway to four lanes with paved shoulder of Harike-Zira-Faridhkote and Faridhkote to Kolkapura-Bhatinda section of NH-15 in the state of Punjab.

36. Topographical survey for up gradation of state Highways in Uttar Pradesh through Engineering. Procurement and Construction (EPC)Basis. Package-10 Panipat-Khatima Road (UP Section)(SH-12) 147 km 4-lane.

37. Topographical survey for Nepal Border (at Kakarvila) to Bangladesh Border (at Banglahandha) comprising of KakarbittaPanitanki-Bagdodara-Shivmandir more-Naukaghat-Fulbari-Banglabandha section 33 km of AH-02 Corridore in the stste of West Bengal.

38. Topographical survey for Pilibhit-Lakhimpur-Nanpara NH-730 229 km the state of Uttar Pradesh.

39. Topographical survey for Detailed Feasibility Report for upgradation of Roads in the state of Uttar Pradesh for Sitapur-Lakhimpur-Palia-Dudhwa Road(SH-90,SH-21). Najafgarh Drain Kakrola Mode to Nehru Vihar in The State of Delhi for Feedback Infra.

40. Topographical survey for Dungergarh-Rajgarh SH-6 in the state of Rajasthan.

41. Topographical survey for Metra city-Datiwara SH-21 87 km Siwana to Balesar SH-66 -90km, Dangiawas to Balotra SH-68-130 km in the state of Rajasthan for Feedback Infra.

42. Topographical survey for Jalalbad-Bewar (sh-29) 80 km and Utraula-Faizabad (sh-9)and Utrala to Balrampur (sh-26) in the state of UP.

43. Topographical survey for Transit Cooridor Development at ISBT-Loni Road-Jagatpur-soniaVihar in state of Delhi.

44. Topographical survey for NH-2 Nizamundin circle –Ashram-Badarpur in the State of Delhi.

45. Topographical survey for Rishikesh- Rudraprayag (NH-58) 140km in the State of Uttrakhand.

46. Topographical survey for Kerala PWD Road 248 km for Egis India.

47. Topographical survey for Rehabilitation and Modernization of Irrigation infrastructure of Etawah Branch Canal &Bhognipuar Branch of Lower Ganga Canal System (L.G.C) in Uttar Pradesh 502 km. for REDDECON.

48. Topographical survey for Katihar-Balrampur (SH-98) Package VII-68 km.

49. Topographical survey for Delhi – Jaipur Expressway ( Green Field Project) km 20-40 and km 60-146km.

50. Topographical survey for Srinagar Bypass 60 km

  • Carring Out the DGPS ,Total station and leveling work along the proposed of WDFCC (Idbalgarh to Sabarmati -150 km).
  • Carring Out the DGPS ,Total station and leveling work along the proposed of WDFCC (ISabarmati T Vadodara=210km).

51. Topographical survey for BRDCL Project Vaishali Corridor-78km.

52. Topographical survey for Darbhangha_ North-South corridor-95 km.

53. Topographical survey Patna Road Elevated Project.

  • Agra - Lucknow Expressway new alignment (GREEN FIELD PROJECT) 270 KM and its connected road Firozabad-Fatehabad and Umrada (Tirwa) – Kannauj Total Length=302km and Link Road 35 km.
  • GRIDIH- GANDE at Jharkhand road Topographical survey.

54. Traffic survey four laning of Baharagora to Sambalpur section of NH-6 (KM 199.200 to 567.400).

55. Topographical survey & Traffic survey and Traffic Survey at Panchkula -Yamuna Nagar Section 106 km (NH-73)State of Haryana.

56. Topographical survey for Bikaner to Phalodi at NH-15 State in Rajasthan 165 km.

57. Topographical survey at Patiala- Bhatindakm 50 to km 209.500 of NH-64 State in Punjab 166 km.

58. Topographical survey for NH-5 Bikaner to Phalodi , and Traffic survey NH-65 Salasar–Naguar.

59. Traffic survey for NH-5(Section Bhubneshwer- Ichhapur)

  • ADB TA 7650-REG Regionl Transport Development in South Asia for Traffic Survey at Bangladesh,Bhutan and Nepal Border for Egis International.
  • MP NVDA Dam and Canal project 4000-5000 hect. atKhargone , Dhar and Ali Rajpur District state of Madhya Pradesh.
  • Trans Highway at Arunachal Pradesh NH-229 Tenga to Seppa 80 km this Hilly terrain.
  • NH -6 Center line and Joint Measurement with Taluka Land Record km 489 km.
  • MPRDC at Unhel –khachrod – Badnagar section 51 km.

60. Traffic survey for NH-15 Suratgarh to ShriGanganagr.

  • NHAI Project NH- 6(KM 166 TO KM 649) ROW Pillar and Centre line Stakeout.

61. BRTS Project Mukundpur-Kondliin Delhi Client Egis India (DIMTS)

  • BRTS Project Hubli – Dharwad in Karnataka State client CEPT University Ahmadabad.
  • NH-28A PipraKoti – Raxual (Bihar) topographical survey and Stakeout of Centerline.
  • NRDA Raipur Town Planing topographical survey and Stakeout of Centerline.
  • Udaipur Bypass topographical survey and Stakeout of Centerline.
  • Indore Ring Road detailed topographical survey and Stakeout of Centerline.
  • NH6 (Km 530 to km 649 End of Gujrat Border) detailed topographical survey.
  • NRDA (Naya Raipur Development Authority) 3 LakeBathometry survey and PHQ Site topographical survey.
  • Firozabad Bypass (km 232 to 252) (NH-2 ).
  • Jeolikot to Ghigharikhal (NH 87E KM 0-Km 109) &Bathinda Bypass – Punjab.
  • Sea link project Moramgao to Dona Poula (Goa ),Jabalpur Bypass, Madhya Pradesh / Vijayawada Bypass.